My railway

 

 

 

 

 

How so everything began....

 

        When was my son 1 year, televise fairy tale about choo - choo Tomas. In that moment was resolved of his future occupation (driver) plus about it, didn't we railway will yet sometime guide. To me, humanly that the till then go by train with percent occurrence 1 ride behind 5 years (when wasn't evitation), this was and on the whole surprising.

 

        To Christmas in his two years got his first yard with choo - choo Tomas (all period development you can see through in photo - gallery). A since we're all the world over (most of the Japan) started wantage accessories plus accessories plus ours yard slowly expand.  

 

        After some time we're yard electrifyed, added his full lighting, semaphores plus build up and lighting to the engines plus cars. What I'm be in a position see on youtube, so be about only in the world with this way advanced electrification. Especially inbuilt lighting cars likely nobody else in the world hasn't. Problem occurred with needed parts, when for example micro-fire tongs 1,2V, we're rounded up in Poland (at our place such product there is no) plus inasmuch as, that the in tracks isn't power supply, we had to get and micro-storage batteries to the cars plus ensure their loading (storage batteries are inbuilt plus charging - up connector undermost car). Locomotives to us today drives LiFe storage batteries, on the ground of their higher tension (1,7V after recharge) thereby to us and improved driving power engines.

 

        Like next period was gradual generation landscapes. First we're all originally blue track sprayed with green black colour plus gravel. After by many experiments to us testify most colour Revell, diluted interior - diluents C6000. Other combination colours plus diluents, have had that disadvantage, that the incline to exfoliation. Landscape lack up to the present day ready plus always on her work. Also we're repainting and other accessories, whose original colour to us didn't suit (who when seen red bridge?).

 

        In next period eye to the points add etherial operating plus everything attach to centralized panel. Today is son 8,5 year plus always from choo - choos outgrow, precisely on the contrary. So that us waits yet slews of work plus I hope, that the once whole yard do like stand-by cost on classical panel. Next period have one's turn over cold 2011/12, so that I hope, that the here I'll can as soon as one can show new photograph plus videos.

SEO
TOPlist